On May 3th the EKPP pushed the second sump of the Pozo Azul cave in the northern part of Spain 4020 meters by adding 490 meters of new line.
The distance to the first sump is about 1000 meters which makes the total distance explored more then 5000 meters. In just three days the team of the EKPP build a cable car between sump 1 and sump 2, installed a habitat at the beginning of sump 2 and accomplished a 9 hour push dive with a bottom time of around 4.5 hours and 4.5 hours of decompression.
Maximum depth of the cave reached is 70 meters, water temperature 11c.
Further details will follow soon at www.ekpp.org